Timaz said:Good deal, you are so fast. On a side note, i just heard from the electrical contractor here locally in Az. They installed my level 2 charger this week with the ev project. They wanted to set up an inspection of the install. There seems to be a lot of pressure to do it right away? I told them my new date of 1/5 to receive the car and there was some optimism that it may be earlier?? Not sure what they really know, but they are sure want to get that inspection done and flip the breaker to on for my charger!
While in no way official, I was told by an EVP person that I was still on schedule to take delivery this month. I haven't received the EVSE install call yet, but was told that the contractor is already pulling my permits. We shall see.