dgpcolorado
Well-known member
Green River to SLC would certainly be possible in the S85. But a 200 mile range Model III? That's a stretch and at the very least it would mean a slow range charge in Green River (or SLC southbound).KJD said:Rumor has it that Price will happen.
http://www.teslamotorsclub.com/showthread.php/43959-Supercharger-Price-UT" onclick="window.open(this.href);return false;
I have also talked to one 85 owner that has already done Green River to SLC via 6 without problem.
A Price Supercharger station would be a big help. As you might expect, I always take US 6 via Price when headed to SLC. I really like that rest stop at the top of the pass; good place for a picnic lunch.