I am in San Francisco Area. My order date was on Jan 13, 2011.
My eTec application was accepted in early of March. On 03/25/2011, I got and signed the EV RPA.
Before the eTec project run in San Francisco bay area, I applied and got the permit to install the 2nd electric meter and EV charger in my home. After my eTec application was accepted, I called Blink couple times for allowing them to use the permit to install the charger by considering a more efficiency way (saving time and money for the eTec project). I was always told the regional contractor or officer would call me soon, but which never happened. Yesterday, I called Blink again. Bind found out there were two account numbers under my names and said this (two account numbers) might cause the delay I my case. Then Blink combined two account numbers to one and told me my cases would go fine. Unfortunately this morning my DB showed “You don’t meet the criteria for the free eTec home charger”. I called the Nissan CS. I was told my zip code (my zip code: 94303) might not be qualified for the eTec project. I totally did not agree with it. Then, Nissan tried switching the call to Blink at 1-888-998-2546, but no one could pick up the call.