TRONZ
Well-known member
I sit in the camp that public L2 charging is necessary for early EV's but will become unnecessary as ranges increase. So looking ahead a few years people will be charging at home for a 200 mile range and using L3 for road trips. I am very interested in how new home construction should include pre-wiring for EV's. The entire system is not necessary, such as EVSE, second meter, etc. But Requiring empty conduit, J-boxes and stub outs in the right locations is a minimum that should be adopted into the Electrical Code. The ease and cost of doing this work during new construction is incredibly cheap and fast. There are already endless requirements that must be met in the Codes and builders meet them every day. How do we get EV Pre-Wiring added as a new requirement???