I'm the OP in this thread and I'm happy to report that, as of 5/15 my Chargepoint equipment is up and running. My total cost: $86.52 (permit fees-Sacramento County). Total time from application to completion: 60 days. Much of that time was spent waiting for my utility (SMUD) to install a second meter which they require in order to receive their reduced off-peak EV rate. If I had chosen to come off my existing meter at regular rates I would have shaved off about three weeks.
My install was quoted by Solarcity at $950 but Coulomb covered up to $1200 in my case. My original quote, which was for a simple install before they knew I needed the second meter, was $600.