danrjones
Posts: 389
Joined: Wed Apr 17, 2019 8:02 am
Delivery Date: 17 Jun 2019
Location: Ridgecrest, CA

Re: Electrify America Network

Tue Nov 05, 2019 8:09 am

DaveinOlyWA wrote:
Tue Nov 05, 2019 7:25 am
danrjones wrote:
Mon Nov 04, 2019 4:00 pm
Here's a question why would plug share delete a EA listing?

I noted on plug share that all the posts and photos regarding the Coso Junction EA station on 395 got deleted.
Someone started it over, but why would it get deleted?
Some user input is simply too inaccurate. I had a station locally that at one time had 3 different Plugshare entries and the user likely used the "I'm here now" GPS setting to place the stations and missed BADLY to where it was placed on the wrong side of I-5 with the actual station roughly a half mile East of the freeway. Since it was a completely different address, etc. I actually went out to look for this station and based on the address, was at a secured State motor pool lot. NOTHING there but a fence and bunch of vehicles parked inside...
I understand but for the one in question it was right where the users had it, and the users had simply left comments it was under construction and lots of photos, so I don't see why plug share would have erased it. I can't imagine EA asked it to be pulled?

But I do see your point about user confusion. The EA station near Mojave, CA, is as far as I know still waiting for work by the power company, and its marked out of service still. But yet the last plug share visitor said something very odd, that he was plugged in and staying at a near bye hotel. How could he be plugged in if its not done?
2018 Leaf SV Pearl White with Tech and All Weather, Purchased New on 5/3/19

WetEV
Posts: 3202
Joined: Fri May 04, 2012 8:25 am
Delivery Date: 16 Feb 2014
Location: Near Seattle, WA

Re: Electrify America Network

Tue Nov 05, 2019 9:24 am

GetOffYourGas wrote:
Tue Nov 05, 2019 4:29 am
As of Friday, November 1, the EA app showed this:
As of this morning, the EA app shows every station as being "coming soon".
The web page seems more accurate, at least for stations I know about.
WetEV
#49
Most everything around here is wet during the rainy season. And the rainy season is long.
2012 Leaf SL Red (Totaled)
2014 Leaf SL Red
2019 eTron Blue

GRA
Posts: 11176
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Tue Nov 05, 2019 4:29 pm

GetOffYourGas wrote:
Tue Nov 05, 2019 4:29 am
As of Friday, November 1, the EA app showed this:

I wonder if Plugshare shows station status linked to the app, or if they only base their status report on check-ins? PS is still only showing Herkimer (CCS) down as of now.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

WetEV
Posts: 3202
Joined: Fri May 04, 2012 8:25 am
Delivery Date: 16 Feb 2014
Location: Near Seattle, WA

Re: Electrify America Network

Wed Nov 06, 2019 8:50 am

20 City Blvd W
Orange, CA 92868
WetEV
#49
Most everything around here is wet during the rainy season. And the rainy season is long.
2012 Leaf SL Red (Totaled)
2014 Leaf SL Red
2019 eTron Blue

WetEV
Posts: 3202
Joined: Fri May 04, 2012 8:25 am
Delivery Date: 16 Feb 2014
Location: Near Seattle, WA

Re: Electrify America Network

Wed Nov 06, 2019 8:56 am

GRA wrote:
Tue Nov 05, 2019 4:29 pm
GetOffYourGas wrote:
Tue Nov 05, 2019 4:29 am
As of Friday, November 1, the EA app showed this:

I wonder if Plugshare shows station status linked to the app, or if they only base their status report on check-ins? PS is still only showing Herkimer (CCS) down as of now.
Odd. Dated the day before your reply (Nov 4, 2019) is this:

“Electrify America is aware of an issue rendering the CCS chargers at this location temporarily unavailable. The CHAdeMO charger at this location is still available. "
WetEV
#49
Most everything around here is wet during the rainy season. And the rainy season is long.
2012 Leaf SL Red (Totaled)
2014 Leaf SL Red
2019 eTron Blue

GRA
Posts: 11176
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Wed Nov 06, 2019 4:32 pm

WetEV wrote:
Wed Nov 06, 2019 8:56 am
GRA wrote:
Tue Nov 05, 2019 4:29 pm
GetOffYourGas wrote:
Tue Nov 05, 2019 4:29 am
As of Friday, November 1, the EA app showed this:

I wonder if Plugshare shows station status linked to the app, or if they only base their status report on check-ins? PS is still only showing Herkimer (CCS) down as of now.
Odd. Dated the day before your reply (Nov 4, 2019) is this:

“Electrify America is aware of an issue rendering the CCS chargers at this location temporarily unavailable. The CHAdeMO charger at this location is still available. "

Right, that's what my post referred to.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 11176
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Wed Nov 06, 2019 4:37 pm

Per WetEV, Orange, CA (Urb., S.R. 22 ex. 14A. W. of Jct. I-5, ex. 106/107B) is open, #2 for the month and #331 total.

This one's a bit of an oddball, as it has an L2 so is an urban site, but has an extra CCS (i.e. 3/1/1 rather than 2/1/1) charger.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 11176
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Thu Nov 07, 2019 3:44 pm

Gainesville, FL (Jct. I-75 ex. 384/S.R. 24) is open, #3 for the month and #332 total.

This makes it possible to avoid the detour off I-75 to the QC in Lake City, as it's 105 miles from Gainesville to Valdosta, GA via I-75 direct. It's also 146 miles from Tallahassee, so it might also allow bypassing Lake City when coming from the west on I-10 to I-75. It's also 72 miles from Bushnell going south, or you can skip that and go direct to the Tampa QC 116 miles away, or the one in Orlando, 113 miles. This was one of my Top 9 "Coming soon" sites.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

WetEV
Posts: 3202
Joined: Fri May 04, 2012 8:25 am
Delivery Date: 16 Feb 2014
Location: Near Seattle, WA

Re: Electrify America Network

Fri Nov 08, 2019 9:05 am

1071 Santa Rosa Plaza
Santa Rosa, CA 95401
WetEV
#49
Most everything around here is wet during the rainy season. And the rainy season is long.
2012 Leaf SL Red (Totaled)
2014 Leaf SL Red
2019 eTron Blue

WetEV
Posts: 3202
Joined: Fri May 04, 2012 8:25 am
Delivery Date: 16 Feb 2014
Location: Near Seattle, WA

Re: Electrify America Network

Fri Nov 08, 2019 10:05 am

1882 Stagecoach Rd. 88045
Lordsburg, NM 88045
WetEV
#49
Most everything around here is wet during the rainy season. And the rainy season is long.
2012 Leaf SL Red (Totaled)
2014 Leaf SL Red
2019 eTron Blue

Return to “EVSE / Charging Equipment and Networks”