Sat Oct 26, 2019 2:19 pm
I'm back. As WetEV noted, two sites have opened, making 22 for the month and 324 total: Elmhurst, NY (Urb., I-495); Issaquah, WA (I-90 Ex. 15/17). BTW, is it pronounced ISSaquah or IsSAQuah?
ISSaquah--sort of like Ithaca but without a lisp (and a kwa at the end).
- Chris
----------
2017 SV, purchased 8/10/19, Coulis red

WetEV
Posts: 3205
Joined: Fri May 04, 2012 8:25 am
Delivery Date: 16 Feb 2014
Location: Near Seattle, WA

Re: Electrify America Network

Mon Oct 28, 2019 10:41 am

2005 Crow Canyon Place
San Ramon, CA 94583
WetEV
#49
Most everything around here is wet during the rainy season. And the rainy season is long.
2012 Leaf SL Red (Totaled)
2014 Leaf SL Red
2019 eTron Blue

GRA
Posts: 11177
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Mon Oct 28, 2019 5:04 pm

css28 wrote:
Mon Oct 28, 2019 8:19 am
GRA wrote:
Sat Oct 26, 2019 2:19 pm
I'm back. As WetEV noted, two sites have opened, making 22 for the month and 324 total: Elmhurst, NY (Urb., I-495); Issaquah, WA (I-90 Ex. 15/17). BTW, is it pronounced ISSaquah or IsSAQuah?
ISSaquah--sort of like Ithaca but without a lisp (and a kwa at the end).

Thankth. :D
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 11177
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Mon Oct 28, 2019 5:13 pm

As WetEV noted, San Ramon, CA (Urb., I-680 ex. 36) is open, #23 for the month and #325 total. While I appreciate the value of the urban sites, I really want EA to close the remaining gaps on the national interstate and (in California) rural Hwy corridors, and they've been static for a few weeks now.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 11177
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Mon Oct 28, 2019 5:21 pm

coulomb wrote:
Sun Oct 27, 2019 6:42 pm
WetEV wrote:
Sun Oct 27, 2019 5:56 pm
The dual charging cables are not designed to charge two vehicles at the same time, but rather to easily reach your car’s charging port—no matter where it’s located. If either connector is in use, look for a different open charger.
This hadn't penetrated my thick skull till now. They go to all the trouble of putting on a second expensive cable for an extra 3 feet of access? It seems madness.

Maybe the cables fail often, and having a spare on site is worth the expense.

I'm nearly certain that other brands of dual-cable charrgers can charge two vehicles at once, very likely power sharing.
Yeah, having looked at several EA sites, I really don't see the point of the extra cables bar redundancy, as they're so close together it's really not going to provide any more access. Most of the sites I've seen only serve a single parking row with each pedestal only serving a single space, so it's not as if you can connect your car while you wait for the charger to be free, and it will automatically start when the previous user leaves.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 11177
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Mon Oct 28, 2019 6:05 pm

GCC:
Electrify America, Hubject to launch “Plug&Charge” to streamline EV charging payment process
https://www.greencarcongress.com/2019/1 ... 28-ea.html
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

WetEV
Posts: 3205
Joined: Fri May 04, 2012 8:25 am
Delivery Date: 16 Feb 2014
Location: Near Seattle, WA

Re: Electrify America Network

Wed Oct 30, 2019 3:30 pm

Today's openings.

3400 Floral Avenue
Selma, CA 93662

200 Otis Street
Northborough, MA 01532
WetEV
#49
Most everything around here is wet during the rainy season. And the rainy season is long.
2012 Leaf SL Red (Totaled)
2014 Leaf SL Red
2019 eTron Blue

GRA
Posts: 11177
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Wed Oct 30, 2019 4:03 pm

As WetEV noted two sites are open, making 25 for the month and 327 total: Selma, CA (Jct. S.R. 99/43 ex. 118); Northborough, MA (S.R. 9 E. of Jct. U.S. 20).

Selma's been "Coming Soon" for a long time, but doesn't add all that much other than capacity to travel along S.R. 99, as the sites in Bakersfield and at Arbor Faire in Fresno are 117 miles apart - Selma shortens the distance to Bakersfield to 95 miles. While I'm not familiar with driving patterns in the area, Northborough doesn't seem to add much other than capacity to that area either, as Auburn is nearby on the interstate, but maybe it's to avoid the tolls on that route.
Last edited by GRA on Thu Oct 31, 2019 2:54 pm, edited 2 times in total.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

WetEV
Posts: 3205
Joined: Fri May 04, 2012 8:25 am
Delivery Date: 16 Feb 2014
Location: Near Seattle, WA

Re: Electrify America Network

Thu Oct 31, 2019 10:47 am

298 E. Live Oak Avenue
Arcadia, CA 91006
WetEV
#49
Most everything around here is wet during the rainy season. And the rainy season is long.
2012 Leaf SL Red (Totaled)
2014 Leaf SL Red
2019 eTron Blue

GRA
Posts: 11177
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Thu Oct 31, 2019 3:07 pm

Per WetEV, Arcadia, CA (Urb., in between I-10/210/605 & S.R. 164) is open, #26 for the month and #328 total.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

Return to “EVSE / Charging Equipment and Networks”