QC installation gaining momentum.

My Nissan Leaf Forum

Help Support My Nissan Leaf Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
there has already been a thread on what we would pay for a QC. i would pay peak going rates plus 25%...but then again, that would not work in my area since my rates are simply too low. so i would go 50 cents per Kw and that is for 50 Kwh charging.

i am guessing as the charging network fleshes out, there will be more companies, more specs and ...hopefully only a few types of connectors
 
LEAFfan said:
ht2 said:
The Blink DC Quick Charger is already received UL Certification.
http://www.mynissanleaf.com/viewtopic.php?f=26&t=6056" onclick="window.open(this.href);return false;

Our two haven't been UL certified yet. I'm still waiting for them to go online. I guess they are a little different (internally) than the ones that have already been certified. At least that is what the Blink tech guy told me.

Thanks.
Please keep us updated.
You are my information source for AZ(2). :D
 
Today I got an email from ECOtality with the subject line
ECOtality Installs First Blink® DC Fast Charging Station at Portland Fred Meyer

The email said this was the Holloywood store in Portland.
Can anyone verify that this station is available for use ?

KJD
http://www.evalbum.com/3175" onclick="window.open(this.href);return false;
 
KJD said:
Today I got an email from ECOtality with the subject line
ECOtality Installs First Blink® DC Fast Charging Station at Portland Fred Meyer

The email said this was the Holloywood store in Portland.
Can anyone verify that this station is available for use ?

KJD
http://www.evalbum.com/3175" onclick="window.open(this.href);return false;
Yes, I can confirm that it is on and available for use (been turned on since 9/14). :D
 
Back
Top