JPC2822
Well-known member
Nice Jimmy! We just bought our house one year ago. So, we still have a lot of work to do! I will have my man cave one day! I want the LEAF more than my man cave!
turbo2ltr said:I'm on day two of cleaning my man cave. lol. It was finished by the builder and I did an epoxy floor. That floor was the best damn thing I ever did. Hell of a lot of work, but it was worth it being able to clean up oil spills easily.
73 jimmy!
KF7MBK (no radio yet)
ts31825 said:I am scheduled for 8:00 today, Monday December 13. Part of the install is a new meter 40 amp sub-meter base to allow for a second meter.
I will post before and after picture ASAP.
I will ask about other installs in the area and see if they have any delivery information...although I really don't expect to get to much additional information.
If you have any specific question about the install let me know. I do plan to open the EVSE and take pictures of the inside.
Glen
garygid said:Jimmy,
Have you determined what tariff and metering configuration you WANT to use?
Yes, as part of EVProject, you get assigned a tariff, and "require" a 2nd meter.
Keep us posted, please.
I have a similar breaker-panel problem here, but am NOT in the EVProject.
mwalsh said:I'll ask the question everybody's thinking....why does it take four people to install an EVSE?
IBELEAF said:More importantly... why are they wearing hard hats?
Enter your email address to join: