WetEV said:
Goal: We need enough chargers in the correct locations with high enough power and fast enough charging vehicles to make long waits rare.
Less than 1% of cars on the road are electric. More cars should mean more locations and more bays, reducing wait times. Cars are getting faster, I usually need 20 minutes or less with 150kW charging.
We also need the stalls at DCFC stations to be well-maintained and easy to start/use. Something that isn't the case currently for CCS/Chademo, so far as I can tell.
The Ouray station I mentioned above has been down for at least two weeks — just off, don't know why. That is the sort of unreliability that is going to give average drivers — the sort who don't hang out in EV forums — fits!