My last project - charger with grid monitoring (speed lowering when other load detected)

My Nissan Leaf Forum

Help Support My Nissan Leaf Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

Piro

Well-known member
Joined
Feb 19, 2017
Messages
47
Location
Kraków, Poland
Huh, my wifey hiper-duper-hairdryer does not trip our fuses anymore :)
Grid Monitoring = Load Detection & Speed Lowering. How does it work?
A simple example with water kettle fighting for power against my Accelev 2phase->1phase charger.
The kettle is connected to one of the power phases.
Using this function I can charge from 3phase socket 16A breakers with a max speed of 7,2 kW/h without any doubt - charger slows down when needed.

I did same for simple 32A single-phase charger and it works too.

https://www.facebook.com/EVSEChargerAccelev/videos/2644566342249487/
 
image5-4ba9b312.png

Scr1CurrBoostActive-1c37c06b.png
Scr2CurrBoostON-a962c3e3.png
Scr3-9b937e9b.png


I have added SOP (state of power) testing and RCD type B for maximum protection.
I hope looks ok.
 
Back
Top