CEC Grants - Future DCFC Map

Thu Nov 17, 2016 6:14 pm

I have been following the CEC grants for Corridor Fast Charging infrastructure. In their normal grant processing, they issue reports called Localized Health Impact Reports. These reports reveal the expected sites for DCFC installation under these grants.

Here are the two interesting reports:
GFO-15-601 - DC Fast Chargers for California’s North-South Corridors
GFO-15-603 – DC Fast Chargers for California's Interregional Corridors

I had some spare time and I thought it would be interesting to plot the addresses on a map. So, I did just that. The link below is an interactive Google Map that shows pins for all the sites in the two reports above, plus some of the existing DCFC along those corridors. The existing ones are color coded by KW rating since many of the key sites on I-5 are lower power and only provide one connector, CHAdeMO or SAE Combo, not both. You can zoom all the way in and see what businesses are nearby. Clicking on a pin will shows you how many chargers will be installed and which entity is developing the site. All sites in these grants must provide both CHAdeMO and SAE Combo at 50kW with expansion built-in for higher power chargers in the future.

CEC DC Fast Charge Sites - Google My Maps
Last edited by miimura on Tue Oct 29, 2019 2:52 pm, edited 1 time in total.

User avatar
paulgipe
Posts: 312
Joined: Sat Aug 02, 2014 4:23 pm
Delivery Date: 20 Oct 2014
Leaf Number: 311200
Location: Bakersfield, CA 93305
Contact: Website

Re: CEC Grants - Future DCFC Map

Mon Nov 21, 2016 7:20 pm

Very well done map. And very encouraging. In two years we can really get somewhere.

Paul
Bakersfield, California
2017 Bolt LT with DCFC, leased 11/09/17
2015 Nissan S with QC, leased, returned
2013 Chevy Volt Premium, used 10/3/16, sold
L2; ClipperCreek HCS-40; Jesla; JDapter Stub
http://www.wind-works.org

miimura
Posts: 15
Joined: Mon Jul 21, 2014 3:53 pm
Delivery Date: 01 Jan 2016
Location: Los Altos, CA

Re: CEC Grants - Future DCFC Map

Fri May 12, 2017 1:39 pm

I have updated the map. The California Energy Commission staff released a new Localized Health Impacts Report Addendum to the GFO-15-601 North-South Corridors grant. ChargePoint moved eight of their sites, mostly within a few hundred yards of the originally proposed sites. The only exception is that they moved the Lathrop site to the north end of Stockton. Here are the specific changes.

Image
Last edited by miimura on Tue Oct 29, 2019 2:47 pm, edited 1 time in total.

webeleafowners
Posts: 923
Joined: Mon Oct 05, 2015 5:37 pm
Delivery Date: 06 Oct 2015
Location: Okanagan Valley British Columbia

Re: CEC Grants - Future DCFC Map

Fri May 12, 2017 2:42 pm

Finally they are going to do the Las Vegas corridor. That always seemed like a no brainer for me.
2015 Smart Electric Drive convertible.
2016 Nissan Leaf SV 30KWh
EV only Family...well except for the big diesel motorhome. :shock:

User avatar
paulgipe
Posts: 312
Joined: Sat Aug 02, 2014 4:23 pm
Delivery Date: 20 Oct 2014
Leaf Number: 311200
Location: Bakersfield, CA 93305
Contact: Website

Re: CEC Grants - Pismo Beach

Tue Oct 29, 2019 2:37 pm

According to PlugShare and EV Connect, Pismo Beach City Hall is live with one 50 kW station. There are no check-ins but the station appears on both web sites.

https://www.plugshare.com/location/212650

And for those who follow this closely, it appears that the "coming soon" EA station in Paso Robels is now in town on Spring St at the Bank of America according to PlugShare.

https://www.plugshare.com/location/193091

I have not confirmed either site.

Paul
Bakersfield, California
2017 Bolt LT with DCFC, leased 11/09/17
2015 Nissan S with QC, leased, returned
2013 Chevy Volt Premium, used 10/3/16, sold
L2; ClipperCreek HCS-40; Jesla; JDapter Stub
http://www.wind-works.org

miimura
Posts: 15
Joined: Mon Jul 21, 2014 3:53 pm
Delivery Date: 01 Jan 2016
Location: Los Altos, CA

Re: CEC Grants - Future DCFC Map

Tue Oct 29, 2019 2:51 pm

I have been updating the map linked in the first post. You will now find that some of the pins have a plug icon, which indicates that the location is open.

The two sites mentioned by @paulgipe above are useful, but not CEC funded sites.

User avatar
paulgipe
Posts: 312
Joined: Sat Aug 02, 2014 4:23 pm
Delivery Date: 20 Oct 2014
Leaf Number: 311200
Location: Bakersfield, CA 93305
Contact: Website

Re: CEC Grants - Future DCFC Map

Wed Oct 30, 2019 6:17 am

You need to remove the Recargo sites south of San Fran. That contract has been pulled.

I'd put a question mark by the Recargo sites north of San Fran as that contract is under review for non-performance.

See Recargo's DCFC Station Contract on 101 in Central California has expired

Paul
Bakersfield, California
2017 Bolt LT with DCFC, leased 11/09/17
2015 Nissan S with QC, leased, returned
2013 Chevy Volt Premium, used 10/3/16, sold
L2; ClipperCreek HCS-40; Jesla; JDapter Stub
http://www.wind-works.org

miimura
Posts: 15
Joined: Mon Jul 21, 2014 3:53 pm
Delivery Date: 01 Jan 2016
Location: Los Altos, CA

Re: CEC Grants - Future DCFC Map

Wed Oct 30, 2019 10:05 am

paulgipe wrote:
Wed Oct 30, 2019 6:17 am
You need to remove the Recargo sites south of San Fran. That contract has been pulled.

I'd put a question mark by the Recargo sites north of San Fran as that contract is under review for non-performance.

See Recargo's DCFC Station Contract on 101 in Central California has expired

Paul
I have marked the Recargo 15-601 sites with an X icon and put a note in the description.

I have also noted that several more ChargePoint sites are open, including Dunnigan, Placerville, and Colfax. At least they are according to the ChargePoint app. The Colfax site is not on Plugshare yet. I am most disappointed with the time to get the ChargePoint Buttonwillow and Tejon Ranch sites fully open.

Also, the EVgo Williams site shows one successful charge on Plugshare, but it is not active in the EVgo app yet.

User avatar
paulgipe
Posts: 312
Joined: Sat Aug 02, 2014 4:23 pm
Delivery Date: 20 Oct 2014
Leaf Number: 311200
Location: Bakersfield, CA 93305
Contact: Website

Re: CEC Grants - Future DCFC Map

Mon Nov 04, 2019 5:43 pm

Some of these stations on the Interregional Corridor won't be online until mid 2020.

You may want to start following CALeVIP.org. They have a bunch of money that's flowing to DCFC stations.

Paul
Bakersfield, California
2017 Bolt LT with DCFC, leased 11/09/17
2015 Nissan S with QC, leased, returned
2013 Chevy Volt Premium, used 10/3/16, sold
L2; ClipperCreek HCS-40; Jesla; JDapter Stub
http://www.wind-works.org

miimura
Posts: 15
Joined: Mon Jul 21, 2014 3:53 pm
Delivery Date: 01 Jan 2016
Location: Los Altos, CA

Re: CEC Grants - Future DCFC Map

Mon Nov 04, 2019 5:59 pm

paulgipe wrote:
Mon Nov 04, 2019 5:43 pm
Some of these stations on the Interregional Corridor won't be online until mid 2020.

You may want to start following CALeVIP.org. They have a bunch of money that's flowing to DCFC stations.

Paul
I took a look at their site and while it does have a bunch of information for how to apply for grants, I didn't find any reports of approved or funded sites. If you have any info about how to locate specific funded sites, I would welcome it.