Linda Urata of Kern COG has issued a report on the status of DCFC stations on Hwy 58, 14, and 395 (Bakersfield, Tehachapi, Mojave, and Inyokern). These stations have been long awaited.

"California Energy Commission GFO-15-603
DC Fast chargers for California’s Interregional Corridors Awarded in 2016
CEC Corridor 7: SR 14 East of Santa Clarita to Inyokern
ChargePoint
Palmdale – Target. 2 DCFC and 1 dual L2; utility construction work is currently being performed
Santa Clarita – Kohls. 2 DCFC and 1 dual L2; site designed and in permitting
Mojave – Denny’s. 4 DCFC and 1 dual L2; site designed and in permitting
Inyokern – Brady’s Mobil/Market. 1 DCFC and 1 dual L2; site designed and in permitting
EV Connect
Palmdale is installed at City Hall
Lancaster is almost ready, on K street 400 yards from the I-14.
Mojave and Inyokern are just starting construction. Mojave is at the Airport main building as is Inyokern. Should be operational by August 1"

Note that EV Connect has been promising the start of construction of the Mojave and Inyokern sites for months.

Paul



"CEC Corridor 8 SR 58 East of Bakersfield to Lenwood
ChargePoint
Bakersfield – Bakersfield Countryside Market and Restaurant. 2 DCFC and 1 dual L2; site designed and in permitting
Tehachapi – Denny’s. 2 DCFC and 1 LS; permits received and now scheduling construction
Mojave – 4 DCFC; site designed and in permitting same as SR 14 site.
Boron – Chevron. This site is not going to be built. There is no three-phase power and the local substation is at capacity. SCE has plans to expand the substation but has no timeline. Equipment allocated for this site will be moved to another one"
Bakersfield, California
2017 Bolt LT with DCFC, leased 11/09/17
2015 Nissan S with QC, leased, returned
2013 Chevy Volt Premium, used 10/3/16, sold
L2; ClipperCreek HCS-40; Jesla; JDapter Stub
http://www.wind-works.org

User avatar
paulgipe
Posts: 356
Joined: Sat Aug 02, 2014 4:23 pm
Delivery Date: 20 Oct 2014
Leaf Number: 311200
Location: Bakersfield, CA 93305
Contact: Website

Re: Update on CEC DCFC Stations in Tehachapi, Mojave, and Inyokern, Calfornia

Sat Jul 04, 2020 9:20 am

Tehachapi CP dual kiosk station is open. See Plugshare for charge session 2 July 2020.
Bakersfield, California
2017 Bolt LT with DCFC, leased 11/09/17
2015 Nissan S with QC, leased, returned
2013 Chevy Volt Premium, used 10/3/16, sold
L2; ClipperCreek HCS-40; Jesla; JDapter Stub
http://www.wind-works.org

danrjones
Posts: 692
Joined: Wed Apr 17, 2019 8:02 am
Delivery Date: 17 Jun 2019
Location: Ridgecrest, CA

Re: Update on CEC DCFC Stations in Tehachapi, Mojave, and Inyokern, Calfornia

Mon Jul 06, 2020 8:01 am

paulgipe wrote:
Sat Jul 04, 2020 9:20 am
Tehachapi CP dual kiosk station is open. See Plugshare for charge session 2 July 2020.
Step in the right direction! thnx!
2018 Leaf SV Pearl White with Tech and All Weather, Purchased New on 5/3/19

danrjones
Posts: 692
Joined: Wed Apr 17, 2019 8:02 am
Delivery Date: 17 Jun 2019
Location: Ridgecrest, CA

Re: Update on CEC DCFC Stations in Tehachapi, Mojave, and Inyokern, Calfornia

Sun Jul 12, 2020 7:10 am

Checked inyokern yesterday. No change. Still waiting for SCE / transformer. Going backpacking late next week and I'll check Coso then.
2018 Leaf SV Pearl White with Tech and All Weather, Purchased New on 5/3/19

User avatar
paulgipe
Posts: 356
Joined: Sat Aug 02, 2014 4:23 pm
Delivery Date: 20 Oct 2014
Leaf Number: 311200
Location: Bakersfield, CA 93305
Contact: Website

Re: Update on CEC DCFC Stations in Tehachapi, Mojave, and Inyokern, Calfornia

Sun Jul 12, 2020 2:43 pm

danrjones wrote:
Sun Jul 12, 2020 7:10 am
Checked inyokern yesterday. No change. Still waiting for SCE / transformer. Going backpacking late next week and I'll check Coso then.
Enjoy the backcountry Dan. Without those stations I can't get up the East Side easily. I could spend some time charging in Kernville. Would love to get to Horseshoe Meadow.

Went in to Beck Meadow for three days. Came in from Blackrock again via Jackass Peak route.

Paul
Bakersfield, California
2017 Bolt LT with DCFC, leased 11/09/17
2015 Nissan S with QC, leased, returned
2013 Chevy Volt Premium, used 10/3/16, sold
L2; ClipperCreek HCS-40; Jesla; JDapter Stub
http://www.wind-works.org

danrjones
Posts: 692
Joined: Wed Apr 17, 2019 8:02 am
Delivery Date: 17 Jun 2019
Location: Ridgecrest, CA

Re: Update on CEC DCFC Stations in Tehachapi, Mojave, and Inyokern, Calfornia

Sun Jul 12, 2020 4:37 pm

Honestly, I have to use my wife's outback to get there as my leaf certainly can't get up there either. I'm looking forward to being able to hike and backpack without using gas but its just not possible yet.
2018 Leaf SV Pearl White with Tech and All Weather, Purchased New on 5/3/19

cwerdna
Posts: 10770
Joined: Fri Jun 03, 2011 4:31 pm
Delivery Date: 28 Jul 2013
Location: SF Bay Area, CA

Re: Update on CEC DCFC Stations in Tehachapi, Mojave, and Inyokern, Calfornia

Sun Jul 12, 2020 5:13 pm

Those are 3 places to cook your battery, esp. if there's no battery thermal management.

When I think of Mojave of its desert. I'd never heard of Inyokern before but these are current temps (as of 5:12 pm Pacific time) in the 3 towns in the subject line:
90 F
103 F
108 F

'19 Bolt Premier
'13 Leaf SV w/premium (owned)
'13 Leaf SV w/QC + LED & premium (lease over)

Please don't PM me with Leaf questions. Just post in the topic that seems most appropriate.

danrjones
Posts: 692
Joined: Wed Apr 17, 2019 8:02 am
Delivery Date: 17 Jun 2019
Location: Ridgecrest, CA

Re: Update on CEC DCFC Stations in Tehachapi, Mojave, and Inyokern, Calfornia

Sun Jul 12, 2020 5:55 pm

Yep I live out here. It was 113 a few minutes ago. Some on here say the newer leaf batteries do fine with heat. I'm not convinced. Certainly they don't do fine trying to repeatedly charge.

Inyokern is on the west side of Indian wells Valley where 14 and 395 come together. Ridgecrest is on the east side of the same valley.
2018 Leaf SV Pearl White with Tech and All Weather, Purchased New on 5/3/19

cwerdna
Posts: 10770
Joined: Fri Jun 03, 2011 4:31 pm
Delivery Date: 28 Jul 2013
Location: SF Bay Area, CA

Re: Update on CEC DCFC Stations in Tehachapi, Mojave, and Inyokern, Calfornia

Sun Jul 12, 2020 8:04 pm

danrjones wrote:
Sun Jul 12, 2020 5:55 pm
Yep I live out here. It was 113 a few minutes ago. Some on here say the newer leaf batteries do fine with heat. I'm not convinced. Certainly they don't do fine trying to repeatedly charge.
You'll notice very few people (maybe only one) makes such claims. The rest of us are waiting for data, which unfortunately means we need to wait.

'19 Bolt Premier
'13 Leaf SV w/premium (owned)
'13 Leaf SV w/QC + LED & premium (lease over)

Please don't PM me with Leaf questions. Just post in the topic that seems most appropriate.

danrjones
Posts: 692
Joined: Wed Apr 17, 2019 8:02 am
Delivery Date: 17 Jun 2019
Location: Ridgecrest, CA

Re: Update on CEC DCFC Stations in Tehachapi, Mojave, and Inyokern, Calfornia

Sun Jul 12, 2020 8:11 pm

cwerdna wrote:
Sun Jul 12, 2020 8:04 pm
danrjones wrote:
Sun Jul 12, 2020 5:55 pm
Yep I live out here. It was 113 a few minutes ago. Some on here say the newer leaf batteries do fine with heat. I'm not convinced. Certainly they don't do fine trying to repeatedly charge.
You'll notice very few people (maybe only one) makes such claims. The rest of us are waiting for data, which unfortunately means we need to wait.
I'm always happy to share data. Just posted an update today in the 40 topic.
2018 Leaf SV Pearl White with Tech and All Weather, Purchased New on 5/3/19