smkettner
Posts: 7501
Joined: Mon Aug 09, 2010 10:13 pm
Delivery Date: 26 Feb 2014
Location: Orange County, CA

Re: EVSE Installation, Info and Cost Comparison Thread

Nope, the 3.3Kw is fine. Just like any appliance it will not draw more than the connector.

So if a new vehicle needs a 50 amp connector it would use a NEMA 10-50P and of course your supply must match.

I don't care to prepare now for all future possibilities. I just want to plug in the Leaf with no added BS.

I suppose this is all needed for public charging that must accomodate every future possibility.
Just saying something basic for home charging should be available IMO.
1 bar lost at 21,451 miles, 16 months.
2 bar lost at 35,339 miles, 25 months.
LEAF traded at 45,400 miles for a RAV4-EV
RAV4 traded in for I-Pace Dec 2018
User avatar
garygid
Posts: 12469
Joined: Wed Apr 21, 2010 8:10 am
Delivery Date: 29 Mar 2011
Leaf Number: 000855
Location: Laguna Hills, Orange Co, CA

Re: EVSE Installation, Info and Cost Comparison Thread

The "something basic" exists for most of the world: the simple, plug-in, in-line, "230 volt", L2 EVSE that plugs into a common, standard, safe-to-use wall-socket.

Unfortunately, in the USA, we have no such common, standard, safe 240v wall-socket, and our 120v wall-socket (not "safe") is the closest thing available.

Also, our "regulators" have refused to move us toward a safe world standard socket, and (apparently) actually forbid us from using those "better" sockets.

Thus, these "wise" people say, a 120-volt version of the EVSE, 1.4 kW, is (essentially) all we can be allowed to use. Thus, Nissan supplies the "Emergency" (VS = Very Slow) L1 EVSE with the LEAF.

In practice, we SHOULD have a "universal" EVSE (for 120/240 operation), with safe sockets we could install in place of our "unsafe" sockets, and adapter plugs to put in the "standard" wall-socket (and leave in an often-used socket). As EVs become common, there will probably be an EVolution, but for now we are being extra-cautious, in the hopes of avoiding ANY bad press. So, in helping the USA to get off oil, and to make EVs a success, we should do the best we can, IMO.
See SOC/GID-Meter and CAN-Do Info
2010 Prius
2011 LEAF, 2014 Tesla S85
2018 & 2019 Tesla Model 3
PU: SDG&E
Solar PV: 33 x 225W -> 7 kW max AC
Craigslist: Xm5000Li Electric Motorcycle
User avatar
TimeHorse
Posts: 999
Joined: Thu May 13, 2010 4:40 am
Delivery Date: 02 Nov 2011

Re: EVSE Installation, Info and Cost Comparison Thread

evnow wrote:All the high quotes & expensive evse is just a short term thing. In a couple of years all the prices will come down.
First the EVSE + Install costs will go up, then they will start going down.
Broken Record wrote:They go up in 1 Jan 2011, when the tax credit expires.
RIP CO2 Fre, 27 months, 42,282 mi & 11 bars.
unAmerican Job & Nissan's Rapid Depreciation cost $20,000!
5 hours on the road daily w/o Charge at Work on 100%.

Long Live CO2 Fre, Maxed 2013 SL, 20,000 mi/yr lease.
http://aecn.timehorse.com/" onclick="window.open(this.href);return false;
JPC2822
Posts: 342
Joined: Sat Aug 07, 2010 10:54 am
Location: San Gabriel, CA

Re: EVSE Installation, Info and Cost Comparison Thread

Hello.
I received a card from Nissan LEAF in the mail today! When you open it says on the yellow card "Congratulations. This is the start of something big" Inside the folded booklet are some cool LEAF bumper or window stickers- one says "For Sale Switching to Electric" the other sticker says "no gas, no tailpipe, no emissions."
Wonder who else received this in the mail from Nissan?
John Paul Cabrera
LEAF Order date 09/01, Fontana Nissan
Next ride: Silver SL LEAF VIN 313 with License plate Qbn LEAF
Estimated delivery: Was Week of February 11th, now Week of Feb. 23rd
Delivered 02/14/11!
AV cash-and-carry installed 12/16/10
JasonT
Posts: 509
Joined: Sun Apr 25, 2010 8:42 am
Location: AZ

Re: EVSE Installation, Info and Cost Comparison Thread

JPC2822 wrote:Wonder who else received this in the mail from Nissan?
Looks like quite a few people: http://www.mynissanleaf.com/viewtopic.php?f=23&t=1321
User avatar
malloryk
Posts: 616
Joined: Wed Aug 11, 2010 9:16 pm
Delivery Date: 08 Jan 2011
Leaf Number: 226
Location: Santa Monica, CA

Re: EVSE Installation, Info and Cost Comparison Thread

anyone get an email today from Coulomb saying they're now taking orders for EVSEs and scheduling home assessments?
Previous Leaf SL w/QC Owner
Current CMAX Energi (302A Package) Owner
Santa Monica

Reserved 4/20; ordered 8/31; took delivery on 1/8/11, returned on 11/26/13; purchased from Fontana Nissan and returned to Gardena Nissan
Tesla
Posts: 23
Joined: Fri Aug 13, 2010 5:01 pm
Delivery Date: 26 Jun 2015
Location: Monterey, CA

Re: EVSE Installation, Info and Cost Comparison Thread

malloryk wrote:anyone get an email today from Coulomb saying they're now taking orders for EVSEs and scheduling home assessments?
I got the email. And this is what it said:
September 28, 2010

Special Program for California EV Buyers.

Get your networked home charging station installed before your new Nissan LEAF arrives.
Specially priced Coulomb Technologies’ ChargePoint networked home charging stations are available to order NOW.

The ChargePoint CT500 charging station:

is a 7.2 kW single output station
delivers Level II (208/240 V @ 30 A) charging
is compatible with all plug-in electric vehicles that comply with the SAE J1772™ plug-in electric vehicle-charging standard
Media coverage:
engadget
GreenBeat


Why buy a “networked” home charging station?
With your ChargePass™ card you can activate SMS and email alerts for:
Vehicle Fully Charged
Plug-Out Detection
Ground Fault Detection (GFCI Trip)
Over-Current Detection
Your ChargePass account will collect all Usage History for your home and public charging with:
Start and End times
Energy (kWh) used
Greenhouse Gases Saved
Occupied Time
Location
*Future feature coming soon: through your ChargePass account you can schedule when you want your vehicle to begin charging, thereby ensuring you receive the best utility rates.


Two ways to order your ChargePoint Networked Charging Station.
ONE:

Contact an authorized Coulomb distributor.
Place an order for your ChargePoint Networked CT500 with special limited pricing that includes an at-home inspection and installation quote.
Schedule an at-home inspection and receive a written installation quote from the installer.
Place your order for installation and receive $100 off the cost of installation.
TWO:

Contact an authorized Coulomb distributor.
Place an order for a $100 at-home inspection (refundable with purchase of installation).
Schedule an at-home inspection and receive an onsite written quote containing your ChargePoint Networked CT500 and installation.
Place your product and installation order with the installer.
Act now. Limited time offer. Contact now for details and pricing.

To order your ChargePoint Networked Charging Station or schedule your home inspection, please contact:

Clean Fuel Connection, Inc.
1-888-890-GOEV and ask for Kristine Manukyan
kristine@cleanfuelconnection.com

Coulomb Technologies is the leader in electric vehicle charging station infrastructure with networked charging stations installed in municipalities and organizations worldwide. Follow Coulomb on Twitter at twitter.com/coulombevi.

2011 BMW ActiveE
2011 Honda Civic GX
2004 Ford F150 Dedicated CNG
User avatar
EVDRIVER
Moderator
Posts: 6753
Joined: Sat Apr 24, 2010 7:51 am

Re: EVSE Installation, Info and Cost Comparison Thread

A week ago and posted it here.
smkettner
Posts: 7501
Joined: Mon Aug 09, 2010 10:13 pm
Delivery Date: 26 Feb 2014
Location: Orange County, CA

Re: EVSE Installation, Info and Cost Comparison Thread

All the BS and no actual price :lol:
I doubt I will buy until there is click and buy competition
1 bar lost at 21,451 miles, 16 months.
2 bar lost at 35,339 miles, 25 months.
LEAF traded at 45,400 miles for a RAV4-EV
RAV4 traded in for I-Pace Dec 2018
josh
Posts: 52
Joined: Tue Aug 31, 2010 6:12 pm
Delivery Date: 26 Jun 2015
Location: Northridge, CA

Re: EVSE Installation, Info and Cost Comparison Thread

I was quoted $1850 for the CT500, plus installation. They expect to have them in stock in the next few weeks. Is it worth the extra money to get a better charger?
Blue SL-e
Reserved, 4/20
9/3 RAQ
March 4 Delivery
9.3KW Solar Electric system
Previous RAV4-EV and GM S10-EV owner

Return to “EVSE / Charging Equipment and Networks”