User avatar
Piro
Vendor
Posts: 42
Joined: Sun Feb 19, 2017 5:47 am
Delivery Date: 19 Feb 2017
Location: Kraków, Poland
Contact: Website Facebook YouTube

My last project - charger with grid monitoring (speed lowering when other load detected)

Fri Oct 25, 2019 2:28 am

Huh, my wifey hiper-duper-hairdryer does not trip our fuses anymore :)
Grid Monitoring = Load Detection & Speed Lowering. How does it work?
A simple example with water kettle fighting for power against my Accelev 2phase->1phase charger.
The kettle is connected to one of the power phases.
Using this function I can charge from 3phase socket 16A breakers with a max speed of 7,2 kW/h without any doubt - charger slows down when needed.

I did same for simple 32A single-phase charger and it works too.

https://www.facebook.com/EVSEChargerAcc ... 342249487/
Alcohol won't solve your problems. On the other hand, milk won't solve them either...
Nissan Leaf tuning http://evtun.com US deliveries from Lake in the Hills, IL

User avatar
Piro
Vendor
Posts: 42
Joined: Sun Feb 19, 2017 5:47 am
Delivery Date: 19 Feb 2017
Location: Kraków, Poland
Contact: Website Facebook YouTube

Re: My last project - charger with grid monitoring (speed lowering when other load detected)

Wed Dec 04, 2019 7:02 am

Image
ImageImageImage

I have added SOP (state of power) testing and RCD type B for maximum protection.
I hope looks ok.
Alcohol won't solve your problems. On the other hand, milk won't solve them either...
Nissan Leaf tuning http://evtun.com US deliveries from Lake in the Hills, IL

Return to “EVSE / Charging Equipment and Networks”