Stoaty
Gold Member
Posts: 4460
Joined: Fri Jun 18, 2010 9:50 pm
Delivery Date: 12 Jun 2011
Leaf Number: 3871
Location: West Los Angeles

Oroville 17 March Spectacular Re-Opening of Main Spillway

Sun Mar 19, 2017 8:47 am

I ran across this interesting 20 minute video showing the re-opening of the spillway at Oroville dam. They got the flow rate up to 50,000 cubic feet per second (1/3 of the original design specification):

https://www.youtube.com/watch?v=kQe0J5NLLT4
2011 Leaf with 62,000 miles given to Nephew
2013 Tesla Model S85 with 251 miles rated range at full charge
Leaf Spy Manual
Battery Aging Model Spreadsheet

derkraut
Posts: 1494
Joined: Fri Jul 16, 2010 7:39 pm
Delivery Date: 14 Jun 2011
Leaf Number: 004248
Location: San Diego vicinity

Re: Oroville 17 March Spectacular Re-Opening of Main Spillway

Mon Mar 20, 2017 8:55 pm

Hey Stoaty.....thanks for the post. The video was very interesting!
Derkraut
Color: Cayenne SLE, ETEC trim
reserved: 5/15/2010
Leaf del. 6/14/2011
New Traction battery installed on 7/28/2017: 12 bars @37.4K+mi. 100% charge: DD readings: Bat temp 81.3F, Gids=283, S=94.1, C=66.13, H=99.79 394V :)

Return to “Off-Topic”