Recent content by ataman

My Nissan Leaf Forum

Help Support My Nissan Leaf Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. A

    BC L3 Quick Charge Station Status

    BCIT is not on Plugshare yet because it is not always operating, currently it is being tested. One of the chargers displays an error and main kiosk is also not available. Please do not put on Plugshare as it is still in testing. Do not rely on the charger being available.
  2. A

    BC L3 Quick Charge Station Status

    Updated the original post... Meritt has been operational for a while. BCIT expected April 1st, currently testing..
  3. A

    BC L3 Quick Charge Station Status

    Stay tuned till after May
  4. A

    BC L3 Quick Charge Station Status

    Kamloops is operational. Good luck getting there!
  5. A

    BC L3 Quick Charge Station Status

    Lots of news! Science World paperwork is complete. Kamloops is ready to be powered up. Merritt is getting ready installation of electronically equipment, foundation is complete. North Van paperwork is done.
  6. A

    iPad Mini mount for LEAF

    I am looking at the cup holder mount from ram mount but I am not sure fi it will fit properly and don't want to fork out almost $100 without knowing if it will work!
  7. A

    BC L3 Quick Charge Station Status

    Squamish now operational!
  8. A

    BC L3 Quick Charge Station Status

    Squamish DCQC is almost ready!
  9. A

    iPad Mini mount for LEAF

    Do you mount your iPad mini in your LEAF? I would love to see how you do it!
  10. A

    BC L3 Quick Charge Station Status

    Thanks for the update!
  11. A

    level 1 charging caused lost SOC

    In my experience, after a long drive, if you charge for short period of time, using whatever method, and keep driving first few percentages drop very quickly. I think this is just the car adjusting. When charging battery voltages are higher, when you unplug, voltages drop causing and it takes a...
  12. A

    BC L3 Quick Charge Station Status

    Currently free, no info about future rates. I am sure they will start charging at some point.
  13. A

    BC L3 Quick Charge Station Status

    Visited Hope and Meritt with my ICE on my way to Penticton. No sign of installation...
  14. A

    Coquihalla Pass

    Last night I drove the same route with an ICE. I kept looking for power along the route and the only candidate I found is Coquihalla Lake Lodge. I would love to see them install a L2, even a NEMA plug or 500$ 20A charger. I do not think they will just do it out of their kindness of their...
  15. A

    BC L3 Quick Charge Station Status

    I confirmed today all BC DCQCs installed by the BC Hydro will use Greenlots app in the future... Next one to require the app will be Duncan.
Back
Top